Field wiring and control setup, Line voltage, Low voltage operation – WaterFurnace Envision Hydronic (NDW) User Manual

Page 17: Ndw installation manual, High voltage connections, 208 volt operation, Thermostat/controller (aquastat), Low voltage connections, Source flow switch (sfs), Load flow switch (lfs)

Advertising
background image

17

NDW INSTALLATION MANUAL

TB

Typical T-Stat

24VAC

24V COM

Comp 1

Comp 2

Rev Valve

Acc 2

Acc 1

Alarm

Circuit 1 Alarm

Circuit 2 Alarm

24VAC

24V COM

Comp 1

Comp 2

Rev Valve

Accessory Item 1

R

C

Y1

Y2

O/B

X2

X1

L

LC1

LC2

R

C

Y1

Y2

B

NOTES:

1) Acc Output 1 is cycled with the lead compressor

2) Acc Output 2 is cycled with the lag compressor

Field Wiring and Control Setup

Figure 2 - High Voltage Connections

Figure 3 - Low Voltage Connections

Line Voltage

High Voltage Connections

Connect power wiring as shown in Figure 2.

208 Volt Operation

Switch red and blue transformer wires for 208V operation.

Low Voltage Operation

Thermostat/Controller (Aquastat)

A two-stage 24 VAC thermostat or liquid controller (field
supplied) must be used to turn the NDW on or off, and
to switch it from cooling to heating if necessary. Multiple
NDWs in the same bank must be controlled from one
thermostat/controller (must be isolation relays for multiple
unit applications).

Low Voltage Connections

Connect low voltage thermostat wiring as shown in Figure
3. Connections shown are for typical thermostat. Actual
connections may vary with specific device used.

NOTE: If a separate transformer is used to supply a Y1, Y2, or
B signal to the unit controls, isolation relays must be used.

CAUTION: Use only copper conductors for field
installed wiring. Terminals in the unit are not
designed for other types of conductors.

WARNING: All wiring must comply with local and
state codes. Disconnect the power supply before
beginning to wire to prevent electrical shock or
equipment damage.

NOTE: Accessory output is selectable as normally open or
normally closed using the unit display. Normally closed is
the factory default setting.

Source Flow Switch (SFS)

Unit is factory shipped with jumpers on the Source Flow
Switch pins J10-45 (entering). Flow proving switch is optional,
hook up as shown in Fig. 4 and Note 6. The unit will not
operate without a flow proving switch or jumper installed.

Load Flow Switch (LFS)

Unit is factory shipped with jumpers on the Load Flow Switch
pins J9-56 (leaving). Flow proving switch is optional, hook
up as shown in Fig. 4 and Note 5. The unit will not operate
without a flow proving switch or jumper installed.

Load and Source Pump

The load or source pump connection allows for 4.2 A at
208/60/1 on each (208/60/1 models only). This pump
supply should be adequate for most applications. Please
consult the electrical schematic and table for more detail.

Figure 4 - Wiring Schematic

SFS

LFS

ES

42
43

44

45

46

47
48

24VAC Com
DI12
DI11
DI10
DI9
DI8
DI7

49
50
51
52
53
54
55
56

DI 3/4/5/6/ Com
DI6
DI5
DI4
DI3
DI2

DI1

9VDC

J10

J9

2

3

1

PB2

Black (54)

Red (55)

Gray (56)

Pink (58)

Brown (57)

Gray (59)

Blue (45)

Blue (46)

Orange (47)

Gray (48)

Connect to R on PB1-1

White (67)

White (66)

Blue (76A)

Blue (76B)

NOTE 2

NOTE 3

NOTE 5

NOTE 6

NOTE 9

C\Wb>]eS`Ac^^Zg

& !$

5

:

:

:

:

B

B

C\Wb>]eS`Ac^^Zg

& !$

5

:

:

:

:

B

B

11/

110

AW\UZS>VOaS

Advertising