System installation, Rack mounting, Power supplies – NeoPro Tahoe-Veo User Manual

Page 6

Advertising
background image

6

System Installation

Rack Mounting

Your Tahoe system ships with the rack mounting ears attached to the chassis.
Installing the unit into the rack will usually require two persons; one to hold the
unit in place and another to install the rack rail screws (not included).

Tip: To avoid dropping unsecured power supply
units on the floor, remove them from the system
prior to lifting the unit into the rack.

Although the actual unit weight will depend on the configuration, the person
hold the unit should be capable of lifting 25 lbs.

Power Supplies

Each power supply in your system requires its own AC power cord to be
plugged in. If power is applied to a power supply, its LED indicator will glow
red. When the Tahoe system senses that it is operating normally, it will enable it,
turning the LED color to green. In most cases this will happen within one
second. If the LED remains red, remove the power supply from the system and
reinsert. If the power supply still will not enable, it may be defective. Contact
technical support for further instructions.

If your system was equipped with one power supply from the factory, and you
are now ready to install a second power supply, you will need to:

1) Remove the blank cover and install the second power supply

2) Use the system setup menu to enable faults from the new power supply.

Refer to page 13, ―System Setup Menu‖.

Advertising