Set-up and welding, Powering up the equipment, Connecting the welding leads – Tru-Weld TWE250 CD Welder User Manual

Page 11

Advertising
background image

 11 

POWERING UP THE EQUIPMENT 

Setup the equipment power supply (Control Unit) and connect to the main power, 
making certain of the proper voltage requirement of the particular unit. 

Capacitor Discharge (CD) units generally require 110 VAC @ 60Hz incoming power.  
Refer to the safety recommendations before plugging this unit in. 

 

 

 

 

 

ON/OFF Switch 

 

 

Circuit Breaker 

 

 

Power Cord (110 VAC) 

 

CONNECTING THE WELDING LEADS 

Connect the welding ground cable into the (+) terminal mount socket on the front of 
the welding unit.  

***NOTE ‐ the cable end plug has a flat which aligns with a dot on the panel mount 
socket. Secure the connector into the panel mount socket, and then turn it clockwise 
until it locks into proper position. Failure to do so could result in damage to the con‐
nector. 

 

 

 

Ground Cable Socket 

SET-UP AND WELDING

Advertising
This manual is related to the following products: