2.5 Position the P-50 with the gland tight against the seal chamber

face. Turn the gland so that the flush tap is as close to the 12:00

o'clock position as possible and so that the flush piping will clear

the bearing frame. Tighten the gland nuts evenly in a diagonal

sequence. Do not overtighten the gland nuts, as this can warp

seal parts and cause leakage.

2.6 Assemble the pump. Avoid pipe strain. Align coupling properly.

2.7 With the impeller, shaft,

coupling, and bearings

in their final operating

positions, tighten the

P-50 set screws.

See Figure 5.

2.8 Remove the setting

devices from the drive

collar. See Figure 6. Save

the setting devices for future

use when the pump impeller

is reset or when the seal is

removed for repairs.

2.9 Turn the shaft by hand

to ensure unobstructed

operation.

2.10 See Operational

Recommendations

before start-up.