CAUTION: Never connect

propane/LP fireplace directly

to the propane/LP supply. This

heater requires an external regu-

lator (not supplied). Install the

external regulator between the

heater and propane/LP supply.

WARNING: Never connect

natural gas fireplace to private

(non-utility) gas wells. This

gas is commonly known as

wellhead gas.

Installation Items Needed

Before installing heater, make sure you have the

items listed below.

• external regulator (for propane/LP units only,

supplied by installer)

• piping (check local codes)

• sealant (resistant to propane/LP gas)

• equipment shutoff valve *

• test gauge connection *

• sediment trap

• tee joint

• pipe wrench

• approved flexible gas line with gas connector

(if allowed by local codes) (provided)

* A CSA design-certified equipment shutoff valve

with 1/8" NPT tap is an acceptable alternative to

test gauge connection. Purchase the optional CSA

design-certified equipment shutoff valve from your

dealer. See Accessories, page 19.

For propane/LP units, the installer must supply

an external regulator. The external regulator will

reduce incoming gas pressure. You must reduce

incoming gas pressure to between 11" and 14" of

water. If you do not reduce incoming gas pres-

sure, heater regulator damage could occur. Install

external regulator with the vent pointing down as

shown in Figure 6. Pointing the vent down protects

it from freezing rain or sleet.

Figure 6 - External Regulator With Vent

Pointing Down

Propane/LP
Supply Tank

External
Regulator

Vent
Pointing
Down

INStALLAtION

Continued

CAUTION: Use only new, black

iron or steel pipe. Internally-tinned

copper tubing may be used in

certain areas. Check your local

codes. Use pipe of 1/2" diameter or

greater to allow proper gas volume

to heater. If pipe is too small, undue

loss of volume will occur.

Installation must include an equipment shutoff

valve, union and plugged 1/8" NPT tap. Locate NPT

tap within reach for test gauge hook up. NPT tap

must be upstream from heater (see Figure 7).
IMPORTANT:

Install equipment shutoff valve

in an accessible location. The equipment shutoff

valve is for turning on or shutting off the gas to

the appliance.

* Purchase the optional CSA design-certified

equipment shutoff valve from your dealer. See

Accessories, page 25.

** Minimum inlet pressure for purpose of input

adjustment.

Figure 7 - Gas Connection

3" Minimum

CSA Design-Certified
Equipment Shutoff Valve
With 1/8" NPT Tap*

Approved
Flexible Gas
Hose (if allowed
by local codes)

Cap Pipe Tee
Nipple Joint

Sediment Trap

Natural Gas

From Gas Meter

(5" W.C.** to 10.5"

W.C. Pressure)

Propane/LP Gas

From External

Regulator

(11" W.C.** to

14" W.C.

Pressure)

To Gas
Control

Advertising