Installation instructions, Hook-up guide (cont’d), Outlet box installation (cont’d) – Monster FlatScreen SuperThin In-Wall PowerCenter 200 User Manual

Page 16

Advertising
background image

ENGLISH

Outlet Box Installation (cont’d)

A) Use a stud finder (available at your local

hardware store) to locate the wall studs near

the location where you wish to install your

In-Wall PowerCenter (close to or behind

the display device). To ensure wire accessibility,

your location should also be vertically aligned

with an existing power source (wall outlet, etc.).

Mark the ideal hole location with dimensions

4³⁄₁₆" x 3⁷⁄₈" in between the wall studs. You can do

this by first holding the Two-Gang Outlet Box with

its open face flush against the wall. Use a pencil

to lightly trace the edge of the Two-Gang Outlet

Box, but not the six outer tabs (see Image 1 at right).

Once you have traced the edges, remove the

Two-Gang Outlet Box (Image 2), and use a straight

edge to lightly draw the rest of the edges and

corners (Image 3). Use a ruler to ensure that the

dimensions are 4³⁄₁₆" x 3⁷⁄₈" before proceeding.

Drill a small hole in the center of the outline,

and feed one end of a coat hanger through

the hole to check for obstructions. If nothing

is detected, carefully cut out the outlined

rectangle with a drywall saw.

INSTALLATION INSTRUCTIONS

Hook-Up Guide (cont’d)

Advertising