Installation – Montigo ME34DV User Manual

Page 5

Advertising
background image

Page 5

Part No. XG0105A

ME34-DV Modular Fireplace

Installation

Installing Terminations with Built-In Frames

Installing Terminations with MSR Frames

12

12

1. Frame the termination opening to 12" x 12".
2. Fasten the termination to the studs using a minimum of 4 screws.

11

11

1. Frame the termination opening to 11" x 11".
2. Fasten the termination to the studs using a minimum of 4

screws.

Installing Terminations with MOSR Frames

12

12

12

MOSR

1. Frame the termination opening to 12" x 12".
2. Fasten the MOSR frame to the interior side of the studs using a

minimum of 4 screws.

3. Insert the termination into the MOSR frame as shown here, and

attach by screwing through the four pilot holes in the termination.

MSR

MTO-3

MTO-3F

MTO-3

MTKOG

Installing Heat Guards over Terminations

1. Ensure that the two

long mounting brackets are facing the bot-

tom of the termination. (See inset). This will provide more heat
protection at the top of the termination, where temperatures are
highest.

2. Attach to the faceplate of the termination using four sheet metal

Advertising