82 (1) connection of gauge manifold, 2) evacuation – MovinCool CM25 Service Manual User Manual

Page 82

Advertising
background image

Repair Section

82

(1) Connection of gauge manifold

1) Properly remove the crushed end of the pinch-off

tube at the high-pressure side and the low

pressure side of the refrigerant cycle with a pipe

cutter.

2) Fit the process tube fitting to the pinch-off tube on

both sides.

3) Connect the charging hoses (red high-pressure

side) for the gauge manifold to the process tube

fitting.

< NOTE >

Connect the hoses using care not to mistake

the high-pressure side for the low-pressure

side and vice versa.

4) Connect the charging hose (green) at the center

of the gauge manifold to the vacuum pump.

(2) Evacuation

1) Open the high-pressure valve (Hl) of the gauge

manifold.

2) Turn on the vacuum pump to start evacuation.

(Evacuate the system for approximately 15

minutes.)

3) When the high-pressure gauge indicates 30 inHg

(100 kPa) or higher, turn off the vacuum pump

and close the high-pressure valve of the gauge

manifold.

I002183

Pinch-Off Tube

Seal

Charging Hose

Side

Refrigerant

Cycle Side

I000568

High-Pressure Valve

(Closed)

High-Pressure

Side Tube

Vacuum Pump

(When Stopped)

Low-Pressure

Valve (Closed)

Red Hose

Green Hose

Process Tube Fitting

I002227

LO

Closed

HI

Open

LO

Closed

HI

Closed

Valve Setting

30 inHg (100 k Pa) or larger

High-Pressure Valve

High-Pressure Gauge

Gauge

High-Pressure

Side Tube

Vacuum Pump

(in Operation)

Low-Pressure

Valve