Online power, Danger – OnLine Power Iso-Care User Manual

Page 20

Advertising
background image

OnLine Power

6002-033 Rev C

5-1

SECTION 5 - MAINTENANCE

5-1 PERIODIC

MAINTENANCE

When to Perform

Perform Periodic Maintenance (PM) every sixth month after installation according to following procedure.

How to Perform

Periodic Maintenance must be accomplished with top cover, front and rear panels removed.

Perform a complete cleaning and inspection as described in the following procedure.

Tools Required

• Common electrician tools

• Vacuum cleaner with hose

PM Procedure

DANGER!!

DISCONNECT INPUT POWER TO ISO-CARE OR NRT BEFORE PERFORMING PERIODIC

MAINTENANCE.

1.

Turn OFF all the units or equipments connected to the Iso-Care or NRT.

2.

Turn facility circuit breaker OFF, lock and tagout in accordance with OSHA Lockout/Tagout requirements.

3.

Remove top cover by unbolting two screws on each side of cover.

4.

Remove front and rear panels by unbolting six screws at corners and at left and right sides of each panel.

5.

Clean dust from all interior surfaces of unit.

Advertising
This manual is related to the following products: