116 sand cultivator parts list, Installation instructions, Accessories – Smithco Super Rake 13-55х (sn 6329 – 6449/1136 -1199) Parts & Service Manual User Manual

Page 75

Advertising
background image

73

Accessories

13-116 SAND CULTIVATOR PARTS LIST

REF#

PART#

DESCRIPTION

QUANTITY

1

HCP-12-150

Clevis Pin

1

/

2

x 1

1

/

2

2

2

13-121

Right Frame Cultivator

1

3

HB-716-14-150

Bolt

7

/

16

- 14 x 1

1

/

2

(Part of Trap Rake)

2

HNTL-716-14

Lock Nut

7

/

16

- 14

(Part of Trap Rake)

2

4

Attachment Lift

(part of Lift Assembly)

1

HSSQ-38-16-200

Square Head Set Screw

3

/

8

-16 x 2

1

HN-38-16

Nut

3

/

8

- 16

1

HB-38-16-125

Bolt

3

/

8

- 16 x 1

1

/

4

1

HW-38

Washer

3

/

8

1

HNTL-38-16

Lock Nut

3

/

8

- 16

1

5

HMB-12-14

Machine Bushing

1

/

2

x 14GA

1

6

HP-18-100

Cotter Pin

1

/

8

x 1

1

7

HMB-34-10

Machine Bushing

3

/

4

x 10GA

12

8

HRP-14-100

Roll Pin

1

/

4

x 1

2

9

HN-38-16

Nut

3

/

8

- 16

8

10

HWL-38

Lockwasher

3

/

8

8

11

13-120

Left Frame Cultivator

1

12

13-096

Blade

4

13

HB-38-16-125

Bolt

3

/

8

- 16 x 1

1

/

4

8

14

13-115

Hitch (Pistols)

2

15

HHP-18

Bridge Pin

1

/

8

2

INSTALLATION INSTRUCTIONS

Optional Lift Assembly 13-505 must be installed before installing this unit on Super 2

1. Attach (Ref 11 and 2) cultivator frames together at center pin using (Ref 5) machine bushings and (Ref 6)

cotter pin.

2. Bolt four (Ref 12) blade assemblies to frames using eight (Ref 13) bolts, (Ref 10) lockwashers and (Ref 9)

nuts. The blade points should angle down and forward.

3. Insert (Ref 14) hitch, (pistols) into tubes of frames ((Ref 11 and 2) with up to five (Ref 7) bushings in front

and one bushing in the rear of tube. Secure pistols with (Ref 8) roll pins. Check spacing before driving roll
pin in all the way. For more tire clearance, the machine bushing may be moved from front to rear.

4. Slide pockets of cultivator frames over arms of (Ref 4) attachment lift.

5. Hook pistols up to tabs under trap rake frame by using rear holes with (Ref 1) clevis pins and (Ref 15)

bridge pin.

6. Start engine to test operation of cultivator. Raise and lower attachment checking for leaks and to see

whether they are fairly level.

Advertising