111 drag mat kit drawing, Installation instructions – Smithco Super Rake 13-55х (sn 6329 – 6449/1136 -1199) Parts & Service Manual User Manual

Page 79

Advertising
background image

77

Accessories

13-111 DRAG MAT KIT DRAWING

REF#

PART#

DESCRIPTION

QUANTITY

1

HHP-18

Bridge Pin 1/8

1

2

Hitch (Part of Tr

a

p

Rake)

1

3

Rake Lift (Part of Trap Rake)

1

4*

HB-38-16-225

Bolt 3/8 - 16 x 21/4

4

HWL-38

L

o

c

kwasher 3

/

8

4

HN-38-16

Nut 3/8 -

1

6

4

5*

13-195

Left M

a

t

Carrier Post

1

6

19-605

Drag Mat Chain

1

7

19-601

Drag Mat

1

8*

13-156

Right Mat Carrier Post

1

9*

13-157

Carrier Lock Strap

2

*

13-112

Carrier Kit, posts with hardware

(includes all * items)

1

INSTALLATION INSTRUCTIONS

1. Looking from the rear of the trap rake, mount the mat carrier post (Ref 8) outside the right rear corner of

the rake lift with the lock strap (Ref 9) on the inside of the rake lift side plate. Bolt into place with two bolts,
nuts and lockwashers (Ref 4).

2. Mount the left mat carrier (Ref 5) outside the left corner similar to the right side with the lock strap (Ref 9)

to the inside.

3. To carry the mat, roll it up and place it in the brackets of the carrier posts.

4. To use the mat, unroll it flat and hook it up to the trap rake hitch with the clevis pin and bridge pin.

Advertising