Two link unit installation with tactical fiber – Grass Valley T-POV Bidirectional Robotic User Manual

Page 61

Advertising
background image

55

T-POV

User Guide

Two Link Unit Installation with Tactical Fiber

Fig. 5-2: Two Link Unit Installation with Tactical Fiber

This scenario is functionally idential to the first usage scenario with the addition of an
added Camera Unit and CCU/Remote Pan & Tilt unit. One 2-Link Unit Base Station (A) is
connected by Fiber Cable to two separate Camera Units (B). The Camera Unit connections
begin with Unit 1 on the left next to the Power and Fiber Connector module. Unit 2 is to the
right of Unit 1.

The Camera Units in this example use two ST connectors each. The Base Station and each
Camera Unit are powered by an ADAP external 12 Volt power supply (D).

This example shows two identical Cameras (E) connected to the Camera Units. This is
illustrative only and a real-world installation could have two different camera types if
required. This example shows two individual Camera Control: Remote Pan & Tilt units (F). A
common CCU could be used if it provides a separate data connection for each of the
remote cameras.

Advertising