Chapter 2 installation, Inspecting the equipment – Eaton Electrical Extended Battery Module (EBM) 9140 User Manual

Page 21

Advertising
background image

EATON Powerware

®

9140 EBM User’s Guide

S 164201623 Rev A FINAL DRAFT 2006 July 14

15

Chapter 2

Installation

NOTE If you are installing the UPS and the Extended Battery Module (EBM) together,
follow the installation instructions in the UPS user’s guide.

This section explains:

S

Equipment inspection

S

Unpacking the cabinet

S

EBM setup and installation, including EBM batteries

Inspecting the Equipment

If any equipment has been damaged during shipment, keep the shipping
cartons and packing materials for the carrier or place of purchase and file
a claim for shipping damage. If you discover damage after acceptance,
file a claim for concealed damage.

To file a claim for shipping damage or concealed damage: 1) File with
the carrier within 15 days of receipt of the equipment; 2) Send a copy of
the damage claim within 15 days to your service representative.

NOTE Check the battery recharge date on the shipping carton label. If the date has expired
and the batteries were never recharged, do not use the UPS. Contact your service
representative.

Advertising