Eaton Electrical Extended Battery Module (EBM) 9140 User Manual

Page 28

Advertising
background image

INSTALLATION

EATON Powerware

®

9140 EBM User’s Guide

S 164201623 Rev A FINAL DRAFT 2006 July 14

22

11. If installing the optional seismic mounting brackets, align the two

EBM seismic mounting brackets with the screw holes on the sides
of the EBM above the rear mounting brackets. Loosely secure the
brackets with four supplied wing bolts. See Figure 7.

Do not tighten the wing bolts.

Figure 7. Installing the Optional EBM Seismic Mounting Brackets

12. Slide the EBM into the rack. Verify that the rear mounting brackets

engage in and slide easily along the inside of the rails.

13. Secure the front of the cabinet to the rack as shown in Figure 8.

If the rack holes are square, use two cage nuts. If the rack holes are
round, use two clip nuts.

Position 2 (M5 screw)

Position 8 (M6 screw

and clip/cage nut)

Position 3 (M5 screw)

Figure 8. Securing the Front of the EBM

Advertising