Chapter 3 operation, Configuring the ups for ebms – Eaton Electrical Extended Battery Module (EBM) 9140 User Manual

Page 33

Advertising
background image

EATON Powerware

®

9140 EBM User’s Guide

S 164201623 Rev A FINAL DRAFT 2006 July 14

27

Chapter 3

Operation

This chapter contains information on how to configure the UPS for
Extended Battery Modules (EBMs) and initiate the battery test.

Configuring the UPS for EBMs

To ensure maximum battery runtime, configure the UPS for the correct
number of EBMs:

1.

Select MENU from the UPS system status screen, then select
SETUP, USER SETUP, and BATTERY PACK.

2.

Use the

or

button to select the number of battery packs in

your UPS configuration:

All UPS and EBM Cabinets

Number of Battery Packs

UPS + 1 EBM

2

UPS + 2 EBMs

3

UPS + 3 EBMs

4

UPS + 4 EBMs

5

3.

Press the

button to save the setting.

4.

Press the

button until the system status screen appears.

Advertising