HEIDENHAIN TNC 640 (34059x-01) User Manual
Page 479
HEIDENHAIN TNC 640
479
15.1 Pr
ogr
amming and Ex
ecuting
Simple Mac
h
ining Oper
ations
Straight-line function: See "Straight line L" on page 192, DRILLING
cycle: See User’s Manual, Cycles, Cycle 200 DRILLING.
4 CYCL DEF 200 DRILLING
Define the DRILLING cycle
Q200=5
;SET-UP CLEARANCE
Set-up clearance of the tool above the hole
Q201=-15
;DEPTH
Hole depth (algebraic sign=working direction)
Q206=250
;FEED RATE FOR PLNGNG
Feed rate for drilling
Q202=5
;PLUNGING DEPTH
Depth of each infeed before retraction
Q210=0
;DWELL TIME AT TOP
Dwell time after every retraction in seconds
Q203=-10
;SURFACE COORDINATE
Coordinate of the workpiece surface
Q204=20
;2ND SET-UP CLEARANCE
Set-up clearance of the tool above the hole
Q211=0.2
;DWELL TIME AT DEPTH
Dwell time in seconds at the hole bottom
5 CYCL CALL
Call the DRILLING cycle
6 L Z+200 R0 FMAX M2
Retract the tool
7 END PGM $MDI MM
End of program