HEIDENHAIN TNC 640 (34059x-01) User Manual

Page 479

Advertising
background image

HEIDENHAIN TNC 640

479

15.1 Pr

ogr

amming and Ex

ecuting

Simple Mac

h

ining Oper

ations

Straight-line function: See "Straight line L" on page 192, DRILLING
cycle: See User’s Manual, Cycles, Cycle 200 DRILLING.

4 CYCL DEF 200 DRILLING

Define the DRILLING cycle

Q200=5

;SET-UP CLEARANCE

Set-up clearance of the tool above the hole

Q201=-15

;DEPTH

Hole depth (algebraic sign=working direction)

Q206=250

;FEED RATE FOR PLNGNG

Feed rate for drilling

Q202=5

;PLUNGING DEPTH

Depth of each infeed before retraction

Q210=0

;DWELL TIME AT TOP

Dwell time after every retraction in seconds

Q203=-10

;SURFACE COORDINATE

Coordinate of the workpiece surface

Q204=20

;2ND SET-UP CLEARANCE

Set-up clearance of the tool above the hole

Q211=0.2

;DWELL TIME AT DEPTH

Dwell time in seconds at the hole bottom

5 CYCL CALL

Call the DRILLING cycle

6 L Z+200 R0 FMAX M2

Retract the tool

7 END PGM $MDI MM

End of program

Advertising