Initial installation – Enviro Cara DR C-11500 User Manual

Page 19

Advertising
background image

19

(b) For buildings with vinyl siding, a vinyl siding standoff,

should be installed between the vent cap and the exterior

wall (see Figure 29). Attach the vinyl siding standoff to the

horizontal termination. The vinyl siding standoff prevents

excessive heat from possibly melting the vinyl siding material.

Note that the horizontal vent termination bolts onto the flat

portion of the vinyl siding standoff (shaded area in Figure 29),

so that an air space will exist between the wall and the vent

termination.
(c) The horizontal run of vent pipe must be level and should

have a 1¼ inch (32mm) rise for every one foot

(305mm) of run towards the termination. Never allow

the vent to run downward. This could cause high temperature

and may present the possibility of a fire.
(d) The location of the horizontal vent termination on the

exterior wall must not be easily blocked or obstructed.
(e) When installing a vent pipe in a chase the minimum

clearance to combustibles is 2” (51 mm).
(f) Maintain manufacturer’s clearances to combustibles with

venting.

Initial Installation

QUALIFIED INSTALLERS ONLY

Figure 32: Installation for Cara DR with a

snorkel.

If necessary to get above grade the Cara DR can be

installed using a 14” or 36” snorkel.
Place the unit into position.
Attach a small section of pipe on the unit and mark exterior

wall where vent would pass through the wall.
Cut a 10” (25.4 cm) minimum hole in the wall to maintain

clearances to combustibles. Frame hole as shown in Figure

27.
Install a wall thimble, interior finished collar, and the vent

section through the wall.
Seal around the vent terminal to the structure using a non-

hardening mastic.
Also refer to i

nitial

i

nStallation

- i

nStallation

oF

a

ppliance

.

I

nstallatIon

wIth

o

ptIonal

s

norkel

:

Figure 31: Installation for Cara DR.

Advertising
This manual is related to the following products: