Chapter 4, Chapter 4: hardware setup, Hardware setup – Lanner LEC-7388S User Manual

Page 17: Preparing the hardware installation

Advertising
background image

17

Hardware Setup

Chapter 4

Embedded and Industrial Computing

Chapter 4:

Hardware Setup

Preparing the Hardware Installation

To access some components and perform certain service

procedures, you must perform the following procedures

first.

WARNING: To reduce the risk of personal injury,

electric shock, or damage to the equipment,

remove the power cord to remove power from

the server. Portions of the power supply and some

internal circuitry remain active until power is

removed.

Unpower the LEC-7388S and make sure that the power

1.

source is removed.

Disconnect the two screws on the front panel from the

2.

system chassis. Pull the OPS module out for component

removal or installation.

Installing the System Memory

The motherboard supports DDR3L memory that features

data transfer rates of 1333 MHz to meet the higher

bandwidth requirements of the latest operating system

and Internet applications. It comes with one Double Data

Rate 3 Low Voltage (DDR3L) Small Outline Dual Inline

Memory Module (SO-DIMM) socket.

Put the device upside down.

1.

Take off the cover to access the memory.

2.

Align the memory module’s key with the SO-DIMM

3.

socket’s key.
Install the SO-DIMM.

4.

Install the cover back to the system.

5.

Note:

SO-DIMMs installed should meet the required

1.

speed which is DDR3L 1333 MHz. Do not install

SO-DIMM supporting different speeds.

The motherboards can support up to 16 GB

2.

memory capacity in maximum.

Advertising