Installation / operation, Operation start-up – Miomare LED Washbasin Fitting / LED Bath/Shower Fitting User Manual

Page 32

Advertising
background image

32 GB

Installation / Operation

designated female threads on the fitting

1

(see Fig. C2).

Unscrew the handle from part 1 of the pop-up

pull rod

3

and insert it into the fitting

1

from

the bottom up so the female thread on the han-
dle faces to the back through the rear opening
on the fitting. Then screw it to the handle (see
Fig. C3).

Position the fitting

1

over the washbasin tap

hole (see Fig. C4).

Below the washbasin first place the C sealing

washer

6

, then the C metal washer

7

over

the two thread bolts

8

(see Fig. C4).

Now screw the securing nuts

9

onto the thread

bolts

8

and tighten with a spanner SW 9 mm

until the fitting

1

is firmly seated on the

washbasin (see Fig. C4).

Unscrew the upper pop-up flange

15

from the

lower pop-up flange

17

.

From the top insert the upper pop-up flange

15

with the upper pop-up seal

14

into the wash-

basin drain hole.

Place the lower pop-up flange

17

with the lower

pop-up seal

16

beneath the washbasin drain

hole.

Now screw together the lower pop-up flange

17

and the upper pop-up flange

15

so the

pop-up plastic nut

19

faces to the back (see

Fig. C5).

Unscrew the pop-up plastic nut

19

from the

lower pop-up flange

17

, leaving the seal in-

side the female thread of the lower pop-up
flange

17

.

ATTENTION! DANGER OF INJURY, SHEET
METAL HAS SHARP EDGES.

Temporarily remove the clip and pop-up joint

11

from the pop-up pivot rod

12

for installation.

Be sure the seal remains on the pop-up pivot
rod

12

.

Place the pop-up plastic nut

19

over the longer

piece of the pop-up pivot rod

12

. Be sure the

seal is placed between the ball and pop-up
plastic nut

19

.

Inset the short section of the pop-up pivot rod

12

into the female thread of the lower pop-up

flange

17

and retighten the pop-up plastic nut

19

hand tight.

Reattach the clip and pop-up joint

11

to the

pop-up pivot rod

12

.

Insert the pup-up pull rod

5

through the plas-

tic section of the pop-up joint

11

and tighten

the screw using a cross-tip screwdriver.

Verify the pop-up is working properly. The plas-

tic screw below the pop-up drain plug

13

may

need to be adjusted. Then retighten with the
lock nut.

Install the siphon by screwing together the

siphon and the pop-up screw thread

18

.

Check the seals inside the swivel nuts

20

on

the flexible connection hoses

10

.

Screw the flexible connection hoses

10

to the

angle valves. Be sure to correctly install the
flexible connection hoses

10

to the cold- / hot

water hoses – left flexible connection hose

10

to the hot water connection, left angle valve,
and the right flexible connection hose

10

to

the cold water connection, right angle valve
(refer to Fig.C5).

Operation

Start-up

After the initial commissioning, carefully check all
connections for leaks.

Check the operation of the fitting. To do so,

swing the handle

23

into all permissible posi-

tions.

Note: the fitting

1

features an LED light. The LED

is lit through an integrated turbine (without batteries).
The LED colour changes automatically based on the
water temperature through an integrated tempera-
ture sensor:
· up to approx. 33°C blue,
· from approx. 33-43°C green,
· over approx. 43°C red.

Note: over approx. 53°C the LED light will begin
to flash red to warn of potential scalding.

Advertising