Installing the pcm 240, Preparing the ceiling, Installing the projector ceiling mount – Extron electronic PROJECTOR CEILING MOUNT PCM 240 User Manual

Page 5: Installation

Advertising
background image

Installation

4

Installing the PCM 240

Before starting, check that all the parts received match the

supplied parts list (see “PCM 240 kit contents” table, page 10).

Preparing the ceiling

W

The PCM 240 must not be supported by the

suspended ceiling itself. It must be secured to and

suspended from the structural ceiling above.

W

Check the structural ceiling to ensure that it can

handle a load four times the weight of the final setup.

N

Refer to local building standards and codes to verify that

the installation will meet all the regulatory requirements.

Identify the location for projector placement. Remove the ceiling

tiles adjacent to the tile where the projector will be mounted.

This will allow easy and safe access while installing the projector

mount.
Inspect the structural ceiling where the projector mount will

be installed to ensure there are no cracks or weaknesses that

could jeopardize the completed installation. Select the correct

installation hardware from those supplied. Hardware for each of

three methods of hanging and securing the PCM 240 is supplied:
• Turnbuckles and tie wire tied to concrete anchors for concrete

structures

• Turnbuckles and tie wire tied to eye screws for joists
• Turnbuckles and tie wire wrapped around wooden trusses.
Alternatively, threaded rods (not supplied) may be used

to secure the mount to the ceiling structure. Safety cable is

provided to hold the mount up in the event that any tie wire or

rods become loose or detached as a result of an earthquake or

accident.

PCM 240 Projector Ceiling Mount • Installation

Installing the projector ceiling mount

1.

Screw the four T-bar securing screws loosely into the ends

of the mounting plate (see figure 2).

Attach Turnbuckles
to Long Sides

T-bar Securing
Screws

Pipe Adapter Plate
Lock Nuts

10

Attach Ceiling
Anchors and Wire
10 Degrees from
Vertical.

T-bar

Mounting Plate

Figure 2 — Installing the PCM 240

2.

Place the mounting plate over the selected ceiling tile and

lower onto the T-bar. Adjust to the position desired and

lightly tighten the T-bar securing screws to the frame.

3.

Adjust the sliding pipe adapter plate to the precise position

for the mounting pole, and tighten down the locking nuts.

4.

Using the hole in the pipe adapter plate as a guide, mark

the ceiling tile where the mounting pole will pass through

it. If electrical boxes are also to be installed, mark the

ceiling tile where the cut-outs will be.

5.

Loosen the T-bar securing screws and remove the

mounting plate.

6.

Remove the tile, and carefully cut out the marked area(s).

7.

Replace the ceiling tile.

N

Be sure to place the ceiling tile back in the same T-bar

square, with the same orientation as it had originally.

Failure to do so will result in misalignment of the

projector.

8.

Attach any 3" deep, ¼ rack devices or electrical boxes

required onto the mounting plate. Depending on the

situation, this may be easier to do after the plate is fully

installed.

C

Using flex conduit is recommended when installing
any power wiring.

5

PCM 240 Projector Ceiling Mount • Installation