Sealey AP6500 User Manual

Page 2

Advertising
background image

4.2

SINGLE bAY RACKING

See Fig.4. Support two upright angle posts (A) in a vertical

position. Join them together at the base using a short step

beam (C). Tap the beam at either end, close to each angle

post to ensure that the tabs are seated in the slots.

4.3

See Fig.5. Continue to assemble the complete bottom frame

in the order indicated below in Fig.5 starting with a long step

beam (B). Ensure that each step beam is facing upwards. Tap

the beam at either end, close to each angle post to ensure

that the tabs are seated at the bottom of the slots.

4.5

See Fig.7. Take the 4 post inserts (E) and push them into

the top of the four angle posts of the bottom frame assembly.

now join the two upper end frames to the bottom frame by

mounting each frame onto the post inserts as shown below.

4.6

See Fig.8. now stabilise the frame assembly by inserting a

shelf support halfway up the frame that joins together the

upper and lower parts of the frame. As each step beam is

added ensure that the top tabs are inserted into the bottom

slots of the upper frame and the lower tabs are inserted

into the top slots of the bottom frame as shown below.

Tap the beams at either end to ensure that the tabs are

properly seated into the slots.

Fig.4

Fig.5

Fig.6

Fig.7

Fig.8

AP6500 Issue: 1 - 05/06/09

4.4

See Fig.6. now make up an upper end frame by connecting

two angle posts together at the top with a short step beam

(C). Tap the beam at either end to ensure that the tabs are

properly seated in the slots. Make up a second upper end

frame using the remaining two angle posts and a short step

beam.

Advertising