Unpacking and installation, Unpacking, Installation – Encore electronic ENMGS-16+2 User Manual

Page 17

Advertising
background image

UNPACKING AND INSTALLATION

This chapter provides unpacking and installation information for the
Switch.

Unpacking

Open the shipping cartons of the Switch and carefully unpacks its
contents. The carton should contain the following items:

‹

One ENMGS-16+2, 16-Port 10/100/1000Mbps Web-Smart
Gigabit Ethernet Switch

‹

One AC power cord, suitable for your area’s electrical power
connections

‹

Four rubber feet to be used for shock cushioning

‹

Screws and two mounting brackets

‹

CD-Rom with Web Management Utility and User’s Guide

If any item is found missing or damaged, please contact your local
reseller for replacement

Installation

The site where you install the hub stack may greatly affect its
performance. When installing, consider the following pointers:

Install the Switch in a fairly cool and dry place. See Technical
Specifications
for the acceptable temperature and humidity operating
ranges.

Install the Switch in a site free from strong electromagnetic field
generators (such as motors), vibration, dust, and direct exposure to
sunlight.

9

Advertising