3.5. PHASE 4 – PREPARATION OF COUNTER-WALL

Before assembling the Klee cladding, it is necessary to create the load-bearing counter-wall (or wall for recessed

installation of the fireplace stove), with an opening of W=1392 mm and H=1360 mm from the floor for the

version F/Puro115 and W=1172 mm and H=1360 mm for the version F/Puro95.

If made of fireproof plasterboard panels, it is necessary to reinforce the counter-wall with metal uprights placed

flush with the hole, vertical and resting on the floor (see drawing). For greater safety, you can use two U-

shaped uprights per side (for a total of four) inserted one inside the other.
Perforate the uprights at the holes and slots in the Klee vertical upright (as in the drawing). The holes (D=5 mm)

are necessary to fasten the Klee steel frame assembled with elements 4 and 5.

N.B. It is advisable to place the counter-wall in its final position only after fastening the Klee frame

(see Phase 5)

1

360

1392 (1172)

MONTANTE

ACCIAIO

MONTANTE

ACCIAIO

VISTA POSTERIORE

FORI DA
REALIZZARE
IN OPERA

FOR

ARE

MON

TAN

TE

ACC

IAIO

MONTANTE

ACCIAIO

MONTANTE

VERTICALE

KLEE

Advertising