INSTALLATION AND USE MANUAL

Chapter 3

KLEE

page

12

Chapter 3

Technical service – all rights reserved by mcz spa

Reproduction prohibited

Place the recessed installation wall in its final location, about 76 mm from Forma Puro and with the opening

centred on the fireplace stove (see drawing). The position of the unit with respect to the counter-wall must be

precise (differences of just a few millimetres) after Phase 7 (

Assembly of Slate Shoulders).

SEZIONE A-A

48

76


3.7. PHASE 6 - ASSEMBLY OF FIRE BED (element 6)

Assemble element 6 (fire bed/ hood support) with element 5 (Klee horizontal upright) using 3 flanged nuts FD

M5 provided.

PIANO FUOCO
(SUPPORTO CAPPA)

MONTANTE

ORIZZONTALE

KLEE