Phase 5 - assembly of ledge (element 11), Installation and use manual chapter 3 magritte – MCZ Magritte User Manual

Page 14

Advertising
background image

INSTALLATION AND USE MANUAL

Chapter 3

MAGRITTE

page

14

Chapter 3

Technical service – all rights reserved by mcz spa
Reproduction prohibited

3.6. PHASE 5 - ASSEMBLY OF LEDGE (element 11)

Place the steel tie (element 13) and the ledge support (element 12) by anchoring it to the ceiling. Make sure to

position it as vertically as possible, and to adjust the level by means of the lug. Place the ledge above the

support and resting on the sides.

42

N.B. ( ) QUOTE MAGRITTE FORMA PURO95

1058 (1300)

MURO PERIMETRALE

MUR

O

PER

IM

E

T

RALE

MURO PERIMETRALE

800

PARETE

200

INCAS

S

O

625 (484)

30

9

95 (854)

80

26

0

570

1108 (1350)

600

A FILO





Advertising