Everpure MRS Reverse Osmosis System MRS-100CC User Manual

Page 3

Advertising
background image

figure 4. Pre-filter

figure 3. No Prefilter

figure 5. RO Reject Flow Control Assembly

3

6. Attach processor to the vertical surface with screws and

anchors designed for the mounting surface material.

WARNING

Do not use screws smaller than #12 for mounting the

processor.

WARNING

Mounting surface may require reinforcement to

support processor safely. Hollow walls, drywall and other non-

structural surfaces are not suitable unless reinforced.

Piping/tubing connections

Refer to Figure 2 for views of the piping, with a description of major

1.

components and connection points. These major components and

connections will be referred to in the following steps.
Prepare the plumbing to accept the RO system. It is recommended

2.

that a three valve by-pass is installed to provide an uninterrupted

supply of water when the RO system requires service.
note: The product water tubing/piping and associated fittings

connecting the RO product outlet to the equipment being serviced

should be food grade material that meets NSF Standard 51 or 61

with a minimum pressure rating of 75-PSI. The product water

will react with most metal piping, creating a corrosive condition,

in addition to imparting an objectionable taste. Plastic pipe or

reinforced tubing are generally very good choices for RO water

distribution materials. The size of the product water tubing/piping

should be 3/8" ID minimum. Distances of 25 feet or greater from

the RO to the equipment being serviced should be 1/2" ID minimum.
Connect the inlet supply.

3.

MODELS WITHOUT PRE-FILTER – See Figure 3. Connect to

A.

the Inlet open port (3/8" JG) on the solenoid valve.

MODELS WITH PRE-FILTER – See Figure 4. Connect to the

B.

Inlet open port (3/8" JG) on the pre-filter head.

Connect the appropriate size and type of tubing/piping and

4.

associated fittings to the Outlet tee connection. Route the line(s)

to the equipment being serviced (i.e.; espresso, coffee, etc.).
Locate the storage tank directly below or adjacent to the

5.

processor assembly. Be sure the mounting surface is capable

of supporting the weight of the tank when full (see specification

table for operating weights). Connect a suitable length of 3/8"

inch OD tubing to the tank connection. Route this section of

tubing to the main processor assembly. Connect the tubing to the

elbow fitting attached to the side of the outlet tee connection.
note: The storage tank pre-charge pressure should be

checked and adjusted when the storage tank is empty. For

most applications, a low (5-10 psi) pre-charge pressure is

recommended, to attain maximum storage tank volume.
Close the inlet, outlet and by-pass ball valves.

6.

Locate the correct reject flow control assembly based on the

7.

illustration below (A). Insert the reject flow control assembly

into the 1/4" OD tube (See A Below). Insert the 1/4" OD tube

with reject flow control assembly into the elbow fitting on RO

head (See B below). Route the other end of the tubing to a drain

nearby, securing it temporarily. Allow an air gap at the drain,

following any applicable local codes. See Figure 5.

continued on the next page . . .

TUBE

FLOW

CONTROL

Model MRS-100

TUBE

FLOW

CONTROL

Model MRS-225

Advertising