Panelview installation, Panelview installation -4, Oxybalance oxygen display and averaging system – Emerson OXYBALANCE IM-106-4050 User Manual

Page 34

Advertising
background image

5-4

Instruction Manual

IM-106-4050 Original Issue

March 2006

OxyBalance Oxygen Display
and Averaging System

PanelView Installation

Mounting Procedures

NOTE
If a communication module is ordered separately, make sure to attach the
module to the base unit before panel installation. Refer to the PanelView Plus
600 manual for information on communication modules.

NOTE
Make sure the sealing gasket is properly positioned on the PanelView Plus
600. This gasket forms a compression seal. DO NOT use sealing compounds.

1. Insert the PanelView Plus 600 through the panel cutout on the front of

the NEMA 4X protective enclosure front panel. Make sure to align the
unit with the center of the panel cutout for adequate gasket sealing.

2. Insert the four mounting levers into the mounting slots on the unit, see

Figure 5-3. Slide each lever until the flat side of the lever touches the
surface of the panel.

3. Once all levers are in place, slide each lever an additional notch or two

until you hear a click.

4. Rotate each lever in the direction indicated until it is in the final latch

position.

5. Connect the power wires to the three wire contacts (L1, L2N, and

ground) on the PanelView Plus 600. see Figure 5-1.

6. Connect the communication cord to the PanelView Plus 600.

This equipment is intended for use in clean, dry environments where only non-conductive
pollution occurs (except occasionally a temporary conductivity caused by condensation),
and with circuits not exceeding Over Voltage Category II (IEC 60664-1).

Disconnect all power before installing or replacing components. Failure to disconnect power
may result in electrical shock and/or damage to the equipment.

Advertising