Figure 4‐8, Figure 4‐9 – Enterasys Networks 7S4280-19-SYS User Manual

Page 50

Advertising
background image

Connecting to the Network

4-10 NAC Controller PEP Installation

Figure 4-8 Eight-Wire Crossover Cable RJ45 Pinouts, Connections Between Hub Devices

Figure 4-9 Eight-Wire Straight-Through Cable RJ45 Pinouts, Connections Between
Switches and End-User Devices

e.

Ensure that the twisted pair connection meets the dB loss and cable specifications outlined 
in the Cabling Guide. Refer to “

Related Documents

” on page xvi for information on 

obtaining this document. If a link is still not established, contact Enterasys Networks. 
Refer to “

Getting Help

” on page xviii for details.

4.

Repeat steps 1 through 3 above, until all connections have been made.

1 RJ45 device port

3 RJ45-to-RJ45 crossover cable

2 Other device port

1 RJ45 device port

3 RJ45-to-RJ45 straight-through cable

2 Other device port

2

1

3

6

4
5

7
8

TX1+

TX2+

RX4-

RX1-

TX4+

RX3-

TX3+

RX2-

TX2+

TX1+

RX3-

RX2-

TX3+

RX4-

TX4+

RX1-

2

1

3

6

4
5

7
8

Б

А

В

TX1+

TX2+

RX4-

RX1-

TX4+

RX3-

TX3+

RX2-

2

1

3

6

4
5

7
8

TX2+

TX1+

RX3-

RX2-

TX3+

RX4-

TX4+

RX1-

2

1

3

6

4
5

7
8

А

В

Б

Advertising
This manual is related to the following products: