Considerations Prior to Installation

3-2 Hardware Installation

Considerations Prior to Installation

When installing the switch, note the following:

Before starting the installation procedure, notify the network administrator of the 
installation.

Follow the installation procedures in the order as presented in this guide. 

Do not connect the switch to the network until you have established the correct IP 
address.

Required Tools

A Phillips screwdriver is required to install the switch into a rack.

Unpacking the Switch

Unpack the switch as follows:

1.

Open the box and remove the packing material protecting the switch.

2.

Verify that the contents of the carton contains the items listed in 

Table 3‐1

.

3.

Remove the tape seal on the non‐conductive bag to remove the switch.

4.

Perform a visual inspection of the switch for any signs of physical damage. Contact 
Enterasys Networks if there are any signs of damage. Refer to 

Getting Help

” on 

page 1‐8 for details.

Table 3-1 Contents of Switch Carton

Item

Quantity

B2G124-24, B2G124-48, or B2H124-48 Switch

1

Mounting kit (two mounting brackets and eight M3x6-mm screws for rack mounting)

1

Rubber feet with adhesive backing for installation on a flat surface

4

AC power cord (The type of power cord is country dependent.)

1

This installation guide

1

Customer Release Notes

1

URL notice card

1

Advertising