haier HB21FC75 User Manual

Page 12

Advertising
background image

English

10

7. Connecting the water line to the “shut off” valve:

Put the tightened nut over the copper or plastic water line,

then the compression fitting, and insert the copper (or

plastic) end inside the “shut off” valve. Make sure the

pipe end sits all the way inside the valve. Tighten

(but don’t over-tighten) the nut. Follow the descriptions

specified in 248CMR of Massachusetts Federal Piping

Standard. Saddle-backed valve is unlawful in

Massachusetts and is forbidden. Please consult a

licensed plumber if you are unsure of the assembly.

8. Clear the water line supply:

Turn on the main water supply until the water in the pipe

becomes clear and clean. Turn off the water valve after

having used water for about 30 seconds – 1 minute.

9. Connect the water supply line to the refrigerator.
note: Before connecting the water line to the refrigerator, make sure the water

line is not draped over the power cord to the refrigerator or power outlet.

(1) Tighten the water supply line at the fridge water

valve by sliding the nut over the water line end.

(2) Then, as shown in the figure, connect the end

side of the water supply line to the water valve;

tighten the water supply line nut with a crescent

wrench.

note: Please make sure that the 1/4" water tube is fully inserted

into the water valve prior to tightening. open the water

supply valve and check for leaks, before positioning the

unit in place.

Advertising
This manual is related to the following products: