Quickspecs, Hp proliant bl25p server blade – HP 275 User Manual

Page 14

Advertising
background image

Power Enclosures Supported

Power Enclosures Supported

Power Enclosures Supported

Power Enclosures Supported

Server Blade Enclosures

Server Blade Enclosures

Server Blade Enclosures

Server Blade Enclosures

Supported

Supported

Supported

Supported

Max. Rack Space Occupied

Max. Rack Space Occupied

Max. Rack Space Occupied

Max. Rack Space Occupied

Scalable Bus Bar

Scalable Bus Bar

Scalable Bus Bar

Scalable Bus Bar

1 or 2

up to 5

36U

Mini Bus Bar

Mini Bus Bar

Mini Bus Bar

Mini Bus Bar

1 or 2

up to 3

21U

Power Bus Box

Power Bus Box

Power Bus Box

Power Bus Box

1

Dual power input kit for mini bus
bar option (364565-B21)
required to support two power
enclosures.

NOTE:

NOTE:

NOTE:

NOTE: To support a full 42U rack
of BL p-Class server blades, use
two stacked pairs of mini bus bars.

1

9U

Required Power Source

Required Power Source

Required Power Source

Required Power Source

Two 30amp redundant power feeds per power enclosure
Connectors
-NEMA receptacles
1-phase L6-30, 250v, 30A 3-wire
3-phase L15-30, 250V, 30A, 4-wire
Optimized for power cabling from bottom and network cabling from top

QuickSpecs

HP ProLiant BL25p Server Blade

HP ProLiant BL25p Server Blade

HP ProLiant BL25p Server Blade

HP ProLiant BL25p Server Blade

Standard Features (Power System and Rack Information)

DA - 12160 North America — Version 7 — June 27, 2005

Page 14

Advertising