Packing list – Harman Stove Company SF160 User Manual

Page 4

Advertising
background image

4

3-90-70742R11_05/13

Packing List

Items needed for assembly and installation.

Please notify your Harman® Dealer if you are missing any items.

Included with Boiler:

--shaker Handle

--ash Pan

--Warranty Registration form
Items In Boiler Kit # 1-00-01020: (Sold Separately)

--Johnson Controls aquastat - (3) pieces; a350 Controller w/ sensor wire

s350 stage Module

Y350 Power supply

--Immersion Well

--Din Rail and (2) End Clamps

--Terminal Box

--Terminal Block and (2) #8-32 nuts

--Pressure Relief Valve (30 psi.)

--Temperature / Pressure Gauge

--automatic Draft Control assembly

--(1 pc.) flex Conduit w/ (2) 90° fittings w/ nuts, and (3) Chase nipples w/ nuts

--(2) Manual Draft Control Knob assembly

--(3) Brass Coil spring Handle

Notice:

The Aquastat controls supplied with the Boiler Kit

are designed only to maintain water temperature

within the boiler. The actual heating system is

controlled separately by your thermostat(s) opening

zone valves or energizing circulation pump(s).

Do not attach a thermostat to the supplied controls.

Appliance Certification.
Model:
Trident series Boiler - sf160, sf260, & sf360.
Test Lab: Omni-Test laboratories, Inc.
Report #: 135-s-05-4
Type: solid fuel (Wood, Coal) fired appliance for

Residential Use
Standard(s): Can/Csa B366.1-M87, and applicable

sections of Ul 834 and ETlM 78.1
note: This appliance is also approved for installation into a

shop.

Advertising
This manual is related to the following products: