5

3-90-70742R11_05/13

Installation

Getting Started
The sheet metal sides and top are easily removed to reduce

the chance of dents and/or scratches in the finish. simply

lift the top off, and that will allow the sides to be pulled away

and up, for removal. To re-install, slide the channel, at the

bottom of each side piece, over the lip at the bottom of the

boiler, and hold downward while moving the side panel into

place. Then slide the top down over the sides.
NOTE: The sheet metal top holds the sides in place,

thus, no bolts or screws are needed.

CAUTION: BOILER SHOULD NOT BE INSTALLED

CLOSER THAN 36 INCHES (915 MM) TO ANY

COMBUSTIBLE MATERIAL

Locating Boiler
Place the boiler as close to the chimney as possible, while

still maintaining the above mentioned clearances. Bolt the

shaker handle on to the block on the side of the boiler, using

the (2) 5/16 X 3/4 in. bolts and lock-washers.
Assembly
Install the Temperature/Pressure Gauge into the pipe stub

in the center of the round plate on the front of the boiler

(fIG. 1)
Install the a350 sensor wire all the way into the immersion

well and screw the well into one of the top hole
Turn the pressure relief valve into the stub on top of the

boiler, next to the supply outlet fitting.
NOTE: Use Teflon tape to seal the threads on all fittings.

Any unused fittings must be plugged
Bolt the two manual draft controls through the holes in the

top load door. (fIG. 2) The draft control knob should spin

freely and open to a distance of approximately 3/8 in. from

the door surface, while being able to close against the door

surface.

FIG. 2

3/8 to 1/2 in.

Immersion

Well

Temp/Pressure

Gauge

Optional

Electric Back-up

Elements

automatic Draft Control

Pressure Relief Valve

FIG. 1

Johnson

Controls

aquastat

and Terminal

Block

shaker Handle

Domestic Hot

Water Coil Option