Furnace installation – Harman Stove Company SF2600A User Manual

Page 5

Advertising
background image

5

To ensure a safe installation, it

is recommended that this furnace be

installed by a qualified installer.

The sheet metal top and sides can be

easily removed to reduce the chance of dents

or scratches on the painted surfaces.

To remove the sheet metal, first lift off the top

section. Now, the sides can be removed by

lifting up and out away from the furnace.

To lighten the SF600, the oil burner

heat exchanger should be removed. Do so by

first removing the sheet metal as described

above. Remove the front sheet metal by first

removing the burner collar. Now remove the

the two long bolts on each side of the heat

exchanger.(Figure B) The entire unit can now

be lifted off and moved separately.

Caution: This furnace must not be

installed closer than 24 inches at the

sides and 30 inches from the rear to

combustible materials. The unit may

only be installed on a non-combustible floor surface such as

concrete floor or concrete pad on dirt floor. The hot air plenum

must be a minimum of 2 inches from the ceiling or other com-

bustibles above the plenum.

Locate the furnace as close to the chimney as possible while

still maintaining the above clearances. No more than 8 feet of stovepipe

should be used, including two or less 90° elbows. All horizontal runs of

pipe should have a minimum /4 in. rise per foot. All stove pipe must be

4 gauge or thicker.

When re-installing the heat exchanger, inspect the gasket around

the furnace opening, and replace if necessary. (Figure A) Place the heat

exchanger in position and secure with the long bolts and nuts. Be sure the

gasket is compressed evenly.

Re-install the sheet metal by sliding the groove on the bottom of

each side panel over the steel lip on the furnace. The top sheet metal

piece holds the sides in place. The SF600 front cover gets installed by

angling the bottom edge over the lip on the top of the firebox. The side

edges must slide into the grooves on each side and pushed in flush with

the sides and top. This front piece is held in place by the black ring which

gets tightened around the burner pipe. Do not over tighten as this will

push the sheet metal in too far.

Furnace Installation

Figure A

Figure b

Inspect Gasket prior to re-

installing heat exchanger.

(4) in. bolts, two on

each side, attach the heat

exchanger to the furnace.