Pipe connection – Harbor Freight Tools Clear Water Pump 69297 User Manual

Page 4

Advertising
background image

Page 4

For technical questions, please call 1-800-444-3353.

SKU 69297

Specifications

Power Requirements

120V~ 60Hz 5A

Discharge/Intake

1 IN. NPT

Maximum Flow

650 GPH

Maximum Delivery Height

98 FT.

Suction Lift

20 FT.

Pressure

43 PSI

Cord Length

6 FT.

Set up

to pRevent electRic Shock and death FRom incoRRect uSaGe FolloW

theSe inStRuctionS:

this is not a submersible pump.

do not immerse in water.

pipe connection

The Pump uses 1" NPT piping (sold separately).

Purchase the necessary length of pipe, including any

needed fittings and bends. Mount the Pump as close to

the source of water as possible and within the range of

the rated Suction Lift. The connections must be airtight.

Wrap all threaded connections with PTFE tape (sold

separately).

Outlet

Priming Plug

Inlet

Pump

Housing

Figure 1

1. Remove the Inlet and Outlet Covers from the Pump.

2. Attach the water source to the Inlet, using appropriate

methods. The Inlet hose or pipe must be collapse-

proof to properly withstand the suction force.

3. Install a foot valve (sold separately)

at the bottom of the inlet.

4. Attach the outlet connection to the Outlet. A

Y-fitting with dual valves (sold separately) is

helpful for priming the pump (see next section).

Advertising