Code requirements, Site requirements, Required tools – Harmar Mobility LIFTS RPL400 User Manual

Page 4: Required materials

Advertising
background image





Code Requirements

Your lift has been designed to meet ASME A18.1 section 5 and CSA B44/ASME A17.5, with the

addition of certain options. Code requirements for Vertical Platform lifts vary depending on location.

It is the installers responsibility to contact their local code enforcement office and determine all of the

regulations they are subject to. You must do this before installing the Vertical Platform Lift.



Site Requirements

• The lift will require a 115vac 20amp grounded circuit.
• Outdoor Installations will require a GFI protected circuit.
• Only install the lift on a 4” thick , level 3,500 psi reinforced concrete slab.
• Foot Print 49” x 69” (this includes the folding access ramp)



Required tools

• 1/2" Hammer Drill
• 3/8" Masonry Drill Bit
• Appliance

Dolly

• Hammer
• Level
• Measuring

Tape

• Socket Wrench Set



Required materials

• 4 Floor anchors
Harmar recommends securing the lift using our Anchor Kit. If you purchase you own

floor anchors they must use 3/8” bolts and have a minimum tensile strength of 6000 LBS.

4

Advertising
This manual is related to the following products: