For Vertical Terminations - To locate the vent and install
the vent sections:

• Locate and mark the vent centerpoint on the underside

of the roof, and drive a nail through the centerpoint.

• Make the outline of the roof hole around the centerpoint

nail.

• The size of the roof hole framing dimensions depend on the

pitch of the roof. There MUST BE a 1-inch (25.4mm) clear-
ance from the vertical vent pipe to combustible materials.

• Mark the roof hole accordingly.

• Cover the opening of the installed vent pipes.

• Cut and frame the roof hole.

• Use framing lumber the same size as the roof rafters

and install the frame securely. Flashing anchored to the
frame must withstand heavy winds.

• Continue to install concentric vent sections up through

the roof hole and up past the roof line until you reach the
appropriate distance above the roof.

WARNING: MAJOR U.S. BUILDING CODES
SPECIFY MINIMUM CHIMNEY AND/OR

VENT HEIGHT ABOVE THE ROOF TOP. THESE MIN-
IMUM HEIGHTS ARE NECESSARY IN THE INTER-
EST OF SAFETY. SEE THE FOLLOWING DIAGRAM
FOR MINIMUM HEIGHTS, PROVIDED THE TERMI-
NATION CAP IS AT LEAST TWO (2) FEET (20 INCH-
ES FOR DVP PIPE) FROM A VERTICAL WALL AND
2-FEET BELOW A HORIZONTAL OVERHANG.

NOTE: This also pertains to vertical vent systems in-
stalled on the outside of the building.

!

Roof Pitch

H (min.) ft.

flat to 6/12

1.0

6/12 to 7/12

1.25

over 7/12 to 8/12

1.5

over 8/12 to 9/12

2.0

over 9/12 to 10/12

2.5

over 10/12 to 11/12

3.25

over 11/12 to 12/12

4.0

over 12/12 to 14/12

5.0

over 14/12 to 16/12

6.0

over 16/12 to 18/12

7.0

over 18/12 to 20/12

7.5

over 20/12 to 21/12

8.0

Figure 27. Minimum Height from Roof to
Lowest Discharge Opening

To seal the roof hole, and to divert rain and snow from the
vent system:

• Attach a flashing to the roof using nails, and use a non-

hardening mastic around the edges of the flashing base
where it meets the roof.

• Attach a storm collar over the flashing joint to form a

water-tight seal. Place non-hardening mastic around the
joint, between the storm collar and the vertical pipe.

• Slide the termination cap over the end of the vent pipe

and snap into place.

HORIZONTAL

OVERHANG

VERTICAL

WALL

TERMINATION

CAP

12

X

ROOF PITCH

IS X/ 12

LOWEST

DISCHARGE

OPENING

H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING

2 FT.
MIN.

2 FT. MIN.

20” MIN.

(DVP PIPE)