Caution – Hearth and Home Technologies MT VERNON Pellet Insert Advanced Energy (AE) MTVERNINSAE-MBK User Manual

Page 16

Advertising
background image

Page 16

7036-135E

September 1, 2008

R

Mt. Vernon Pellet Insert (AE)

C. Full Reline With Outside Air

Figure 16.1

Outside Air
Termination

at

himne

Top

Outside Air
through
Rear Wall

in

mm

min below

in

mm

min above

NOT se metal
plate around
exhaust vent pipe
and seal all edges
with non-flammable
insulation such as
fiberglass mineral
wool or ceramic

o not use high

temperature caulk-
ing materials to
seal an edge to
prevent future
serviceabilit

NOTE: Check clearances carefully for this type of instal-
lation to ensure adequate room for outside air venting.

Check building codes prior to installation.
• Installation MUST comply with local, regional, state and

national codes and regulations.

• Consult local building, fire officials or authorities having

jurisdiction about restrictions, installation inspection, and
permits.

CAUTION

NOTE: In Canada only a full reline is allowed per ULC
S628, ORD ULC C1482-M1990.

Advertising