Hearth and Home Technologies VRT-GY-P-CE User Manual

Page 24

Advertising
background image

24

Heat & Glo • VRTIKL-CE • 7031-292 Rev E • 12/07

8

Appliance Setup

A. Remove Shipping Materials

B. Unbolting Appliance from the Pallet

The gas stove is bolted and screwed to the pallet for ship-
ping. Use a 1/2 in. socket to remove the bolt in center of
bottom plate. Use a Phillips screwdriver to remove the two
screws in the front of the bottom plate and the two screws
holding the metal strap across the back of the gas stove.
Refer to Figure 8.2 for locations.

Figure 8.1

Remove shipping materials from inside or underneath the
fi rebox.

The gas line is shipped inside back panel. To access the gas
line remove the top plate from the gas stove. Remove and
retain the two Allen head screws that hold the back panel in
place. Replace panel when fi nished.

Figure 8.2

C. Leveling and Bolting Down the Appliance

Tipping Risk
• Install gas stove on a stable, level platform/

fl oor strong enough to support gas stove
without tipping.

• USE

wood

fl ooring, ceramic tile, brick hearth

or high pressure laminate fl ooring applied
directly over the sub-fl ooring material.

WARNING

SECURING THE GAS STOVE

IS REQUIRED.

Figure 8.3

After unbolting the gas stove from the pallet, insert two 1/4
20 x 1-1/2 (or equivalent) counterscrews.

Using pliers, adjust the counterscrews to level the gas
stove.

ALLEN HEAD SCREWS

ALLEN HEAD SCREWS

LEVELING

LEVELING

SCREWS

SCREWS

LAG BOLT

LAG BOLT

HOLE

HOLE

Advertising
This manual is related to the following products: