Modifying backup specifications, Scheduling backup specifications, Scheduling example – HP A.06.11 User Manual

Page 190: 190 scheduling backup specifications, Scheduling backup, Specifications

Advertising
background image

Description

Option

Specifies non-database files of the Oracle SAP R/3 environment
to be saved.

Save these files in a separate backup session.

Objects outside
database

NOTE:

The total number of sapback processes started in one session using Data Protector is
limited to 256.

Modifying backup specifications

To modify your backup specification, click its name in the Scoping Pane of the Backup
context, then click the appropriate tab, and apply the changes.

Scheduling backup specifications

You can run unattended backups at specific times or periodically. For details on
scheduling, see the online Help index: “scheduled backups”.

Scheduling example

To schedule Full backups at 8:00, 13:00, and 18:00 during week days:

1.

In the Schedule property page, select the starting date in the calendar and click
Add to open the Schedule Backup dialog box.

2.

Under Recurring, select Weekly. Under Time options, select 8:00. Under Recurring
Options, select Mon, Tue, Wed, Thu, and Fri. See

Figure 38

on page 191.

Click OK.

3.

Repeat

Step 1

on page 190 and

Step 2

on page 190 to schedule backups at

13:00 and 18:00.

4.

Click Apply to save the changes.

Integrating SAP R/3 and Data Protector

190

Advertising