Installing splashguard and lower front panel – hussmann P/N 0420057_B User Manual

Page 24

Advertising
background image

INSTALLING SPLASHGUARD AND

LOWER FRONT PANEL

Make certain that the end assemblies, end
splashguards and end panels have been
installed according to the End Kit instruction.

The splashguard and lower front panel are
shipped inside each case.

After

merchandisers

have been leveled and joined, and all drip
piping, electrical and refrigeration work has
been completed, install the splashguard and
lower front panel.

1. At front of merchandiser, attach a splashguard

retainer/bracket to each leg with sheet metal
screws.

2. Position top of splashguard over the top edge

of the retainer/bracket as shown below.

3. Push the lower edge of the splashguard toward

the bottom of the bracket until it snaps into
place.

To Install Lower Front Panel
1. Position the lower front panel with the top

angled as shown in the illustration. Tabs
extending from the upper front assembly are
designed to fit into the slots on the top of the
lower front panel.

2. Once the top is positioned, lift the panel up

and drop it into the groove at the top of the
splashguard.

Do not use additional fasteners or sealant to hold
splashguards or panels in place. To meet NSF
cleanability requirements, splashguards and
panels must be removable without tools.

3-2

D

RIP

P

IPING AND

S

PLASHGUARDS

P/N 0420057_B

U.S. & Canada 1-800-922-1919 • Mexico 1-800-522-1900 • WWW.HUSSMANN.COM

Splashguard

Leg of

Case

2

Leg of

Case

Splashguard

3

Tab

Lower

Front

Panel

Lower Front Panel

Retainer/
Bracket

Leg of

Case

Leg of

Case

1

1

2

Leg of

Case

Advertising