Case leveling, Preparation – hussmann P/N 0420057_B User Manual

Page 9

Advertising
background image

To remove the rider, remove screws attaching
each leg to rider. Remove screws holding rider
cross-members, then slide cross-members out
from between sides. Once cross-members are
out, slide the sides out.

CASE LEVELING

Merchandisers must be installed level to ensure
proper operation of the refrigeration system and
to ensure proper drainage of defrost water.

During all steps of setting, joining and leveling
cases, close attention to glass position and
operation must be maintained. Please review
all steps and photos before making any adjust-
ments. DO NOT make any glass adjustments
until individual case is set and level.

Preparation

1. Using store blueprints, measure off and mark

on floor the exact dimensions/locations of
the case footprint.

2. Snap a chalk line for the front and rear

positions of the base legs.

3. Mark the location of each joint from front

to back lines.

4. FLOORS ARE NOT LEVEL!!! When

working with two or more cases to be joined,
the whole lineup must be leveled on the
same plane, left to right and front to back.
This means that the entire lineup must be
brought up to the level of the highest case in
the lineup.

Along the lines previously marked, find the
highest point of the floor by:

• Walking the floor and noticing any dips

or mounds;

• Using a string level; and
• Using a transit.

P/N 0420057_B

1-3

Service Merchandisers

HUSSMANN CORPORATION, Bridgeton, MO 63044-2483 U.S.A.

Cross-Members

Screws

(each leg)

Sides

Leg

Screws

(two each end

of each

cross-member)

Shipping Rider

for 8 ft Case

Advertising