Dtx-nsm instruction sheet/english page 4 – Fluke NETWORK SERVICE MODULE DTX-NSM User Manual

Page 4

Advertising
background image

DTX-NSM Instruction Sheet/English

Page 4

Running the Connectivity Test

1

Connect to the network using a twisted pair or fiber patch cord.

2

Turn the rotary switch to MONITOR; then select Network Connectivity.

3

Press

P. Figure 2 describes some of the features on the network

connectivity results screen.

4

To save the results press

N

, then select Save Standalone Result or Add to

Cable Test Result. Use the appropriate keys to create an ID for the
standalone result or save the result with an existing cable test result.

1

4

3

2

can03.eps

A

Network speed, duplex mode, PoE
(Power over Ethernet) status, and
MDI/MDI-X status.

B

Select Negotiation Details for details
on the connection.

C

The addresses used and the number
of ping replies received:

: Green: Ping replies received for all

requests.

: Orange: At least one ping reply

received.

: No ping replies received, indicating a

problem with the connection.

D

Use the softkeys to run additional
connectivity tests.

Figure 2. Network Connectivity Results

Advertising