Furuno SC-120 User Manual

Page 38

Advertising
background image

2. INSTALLATION


2-24

9. Fix the PH connector assy. with a clamp as shown in the illustration below.

J1

J4

J3

J1

J7

J10

9 (RED)

J8 (BLK)

J6

J2

J4 (RED)

J5 (BLK)

20P8164

20P8171

Pass PH connector

through clamp

DGPS Receiver
Assy.

Processor unit, cover removed, top view

10. Close the top cover of the processor unit.
11. Mount the DGPS antenna and whip antenna, referring to section 2.2.






Advertising