Furuno RP180 User Manual

Page 85

Advertising
background image

12. INSTALLATION

12-4

8. To connect the AIS transponder, connect the NH connector assy. (5P) to J2, routing the

cable as shown below.

From AIS

J103

J105

J104

J214

J102

SPU Board
03P9230

J101

Attach clamp
(supplied) and
pass through
clamp.

A

Pass through
clamp.

To J2 on
RP Board

Square
Hole

Rear
Chassis

30 mm

Align flush
with chassis.

Exploded
view of A

Solder

Display unit, top view

20 mm

(1) Cut shrink tubing

in 20 mm lengths and
slip onto each wire.

(3) Heat shrink

tubing with

soldering iron.

Shrink tubing

(2) Solder connector

to signal cable.

Solder

HOW TO ATTACH NH CONNECTOR

RP BOARD
14P0390A

RD-A > 3 >

RD-B > 4 >

GND > 5 >

FA-100 AIS TRANSPONDER
Junction Box

J2

FR-1500 MKIII Series

Solder

Armor

*

25

26

27

TD-A

TD-B

GNDiso

*

* = Clamp armor
by cable clamp.

Use JIS cable TTYCS-1Q or
equivalent. (See FA-100's
installation manual.)

Pair

Pair

Connection of AIS

9. Reattach the display unit cover.

Advertising