Troubleshooting, adjustment & service, Troubleshooting, Deck leveling adjustment – Ferris Industries 5901180 User Manual

Page 47: Deck lift spring

Advertising
background image

45

Troubleshooting

DECK LEVELING ADJUSTMENT

NOTE: Before adjusting the deck level, the deck lift
rod timing must be checked and/or adjusted.

1. Park machine on a flat, level surface. Disengage

the PTO, stop the engine and engage the parking
brake. Rear tires must be inflated to 18 psi (1,24
bar); front tires to 25 psi (1,72 bar).

2. Install the cutting height adjustment pin in the

4” (10,2 cm) position. See Figure 42.

3. Place 2 x 4 blocks under each corner of the

mower deck with the 3-1/2” sides being vertical.
Place a 1/4” (0,64 cm) thick spacer on top of the
rear 2 x 4 blocks. See Figure 43.

4. Adjust the front eyebolts until the chains are tight

and the deck is still resting on the 2 x 4’s. Tighten
jam nuts. See Figure 44.

5. Loosen the nuts and allow the rear of the deck to

rest on the 2 x 4’s and 1/4” spacers. Slide the
chains in the slots until the chains are tight and
tighten the nuts. See Figure 44.

6. Remove all 2 x 4 blocks and spacers from under

the mower deck.

Figure 44. Deck Level Adjustment

Troubleshooting, Adjustment & Service

Figure 43. 2 x 4 Locations

DECK LIFT SPRING

The deck lift springs (A, Figure 45) are factory set to
provide optimal lifting performance.

Although it is fastened with an adjustable anchor, this
is NOT AN ADJUSTMENT POINT.

DO NOT attempt to adjust the spring length or lifting
performance will be compromised.

Figure 45. Deck Lift Spring Location
A. Deck Lift Spring

A

Figure 42. Deck Height Pin Position

Advertising
This manual is related to the following products: