Venting installation – FMI (V)3612ST User Manual

Page 10

Advertising
background image

www.fmiproducts.com

115603-01D

10

VenTing inSTallaTion

Continued

Nail Only

Outer

Perimeter

of Flashing

Storm

Collar

Flashing

Cone

Underlap

Shingles

at Bottom

Overlap

Shingles Top

and Sides Only

Figure 24 - Flashing Installation

PENETRATING ROOF

To maintain a 2" clearance to pipe on a roof with

a pitch, a rectangular opening must be cut.
1. Determine the center point through which

pipe will penetrate roof.

2. Determine center point of roof. Pitch is the

distance the roof drops over a given span,

usually 12". A 6/12 pitch means that the

roof drops 6" for each 12" one measure

horizontally down from roof rafters.

3. Use roof opening chart (Figure 23) to

determine correct opening length and

flashing required.

4. Remove shingles around opening mea-

sured. Cut out this section.

5. Add next sections of pipe until end

penetrates roof line. Check to see that

proper clearances are maintained. Extend

chimney by adding sections of double wall

pipe until pipe is minimum of 30" above

highest point of roof cutout. Termination

and chimney must extend a minimum of

36" above highest point where it passes

through the roof.

Figure 25 - Storm Collar

Chimney

Pipe

Waterproof

Caulk

Storm

Collar

Flashing

FLASHING INSTALLATION

Determine flashing to be used with roof open-

ing chart. Slide flashing over pipe until base is

flat against roof. Replace as many shingles as

needed to cover exposed area and flashing

base. Secure in position by nailing through

shingles (see Figure 24). DO NOT NAIL

THROUGH FLASHING CONE.

STORM COLLAR INSTALLATION

(SC-10)

Place storm collar over pipe and slide down

until it is snug against the open edge of the

flashing (see Figures 24 and 25). Apply wa-

terproof caulking to all seams and notches

around storm and also at base around

shingles.

Pitch

Slope Opening

"A" Max.

Used Flashing

Model No.

Flat

19"

V6F-10DM

0-6/12

26.6°

23.25"

V6F-10DM

6/12-

12/12

56.3°

30.75"

V12F-10DM

Figure 23 - Roof Opening Measurements

Opening

“A”

19" Min.

(48.26cm)

30" Min.

(76.2cm)

2" Min.

(5.08cm)

2" Min.

(5.08cm)

2" Min.

(5.08cm)

TERMINATIONS

The fireplace system must be terminated with

the listed round top or chase terminations. In

any case, refer to the installation instructions

supplied with the termination.
Terminations approved for this fireplace are

RLT-12D, which can be used for flashing or

chase and STL-12D for chase style termina-

tion only. Figure 26, page 11, shows an RLT-

12D round top termination.

CAUTION: Do not seal open-

ings on the rooftop flashing. Fol-

low the installation instructions

provided with the termination

being used.