Ch300 installation supplement contents, Check soundome when in dry dock, Tank gasket installation – Furuno CH300 User Manual

Page 12

Advertising
background image

CH300 Installation Supplement Contents

The following checklist and information sheets are provided to help you properly and efficiently

install your CH300 sonar. If this is a high speed vessel, please pay careful attention to the tube length

and fairing instructions.

Page

1-2

Overall installation checklist - Please return a completed copy to Furuno U.S.A.

3

Fiberglass (FRP) sonar tube installation outline drawing

4-6

High speed hull, sonar tube fairing pictures with comment

7

Tank guide assembly installation and adjustment instructions

8

Motion sensor mounting, location and longer interconnect cables

8

Soundome cover and oil installation reminder

9

Tank gasket installation

9

Check soundome when in drydock

10

Adding the EMI Core

Please feel free to contact us with any questions that you may have. Additional information such as

this may be found on our web site www.Furuno.com.

Check Soundome When In Dry Dock

When the vessel is dry-docked, check for any signs of corrosion on the Soundome. Find the reason
for the corrosion and as necessary attach a zinc plate to the hull unit as an anticorrosion measure.

Please feel free to call us at (360) 834-9300 or visit us on the web at www.Furuno.com if you have
any additional questions.

Thank you for purchasing the CH300 Searchlight Sonar System!

Furuno U.S.A., Inc.

Tank Gasket Installation

Page 9

Advertising