Ch300 installation check sheet - continued – Furuno CH300 User Manual

Page 9

Advertising
background image

CH300 Installation Check Sheet - continued

CH304 or CH305 Hull Unit Check List

Check and note actual input voltage:
Are all cables and connections tight and strapped?

Yes

No

Is the unit grounded properly?

Yes

No

Has the EMI Core been added?

Yes

No

Has the soundome been lowered and raised by hand?

Yes

No

Have the shaft guides been adjusted for 0.5mm tolerance?

Yes

No

Does the shaft have a heading mark inscribed?

Yes

No

Is the soundome 1/2" up, in the sonar tube when retracted?

Yes

No

Has epoxy been used on shaft threads?

Yes

No

Has soundome packing sponge been removed?

Yes

No

Was oil added to the soundome?

Yes

No

**CAUTION - Do not lay soundome on its side once oil has been added**

Are all the soundome phillips head screws tight?

Yes

No

Have 3 layers of greased cotton packing been used?

Yes

No

Is the safety clamp installed and tightened?

Yes

No

Accessories Check List - if applicable

Checked operation of the SC-05WR external speaker?

Yes

No

Checked operation of the CH256 handheld remote control?

Yes

No

Sea Trial Information

Date:

Location:

Operator:
System Frequency:

Sea conditions:

Maximum detection range for the sea-bottom:
Maximum detection range for fish targets:
Has the sonar picture been checked for alignment?

Yes

No

Has the auto-retraction feature been checked?

Yes

No

Have the system manuals been given to the operator?

Yes

No

Was any hoist movement noted at maximum speed?

Yes

No

Operator Training

Date:

Location:

Trainer:
Training provided for:

Necessary Follow-up

Required for:
When:

Warranty Card Completed and Sent to Furuno USA

Date:

Page 2

Page 7

Advertising