Goodman Mfg CPG SERIES User Manual

Page 11

Advertising
background image

11

The rating plate is stamped with the model number, type of
gas and gas input rating. Make sure the unit is equipped to
operate on the type of gas available. The gas line installation
must comply with local codes, or in the absence of local codes,
with the latest edition of the National Fuel Gas Code NFPA
54/ANSI Z223.1.

Natural Gas Connection

Length of

Pipe in Feet

1/2

3/4

1

1 1/4

1 1/2

10

132

278

520

1050

1600

20

92

190

350

730

1100

30

73

152

285

590

980

40

63

130

245

500

760

50

56

115

215

440

670

60

50

105

195

400

610

70

46

96

180

370

560

80

43

90

170

350

530

90

40

84

160

320

490

100

38

79

150

305

460

Pressure = .50 PSIG or less and Pressure Drop of 0.3" W.C. (Based

on 0.60 Specific Gravity Gas)

Natural Gas Capacity of Pipe

in Cubic Feet of Gas Per Hour (CFH)

Nominal Black Pipe Size (inches)

B T U H Fu rn ace In p ut

H eating Valu e o f G as (B T U /C u b ic F oo t)

C FH =

Refer to the Proper Piping Practice drawing for the general
layout at the unit. The following rules apply:

1. Use black iron pipe and fittings for the supply piping.

The use of a flex connector and/or copper piping is
permitted as long as it is in agreement with local
codes.

2. Use pipe joint compound on male threads only. Pipe

joint compound must be resistant to the action of the
fuel used.

3. Use ground joint unions.
4. Install a drip leg to trap dirt and moisture before it can

enter the gas valve. The drip leg must be a minimum
of three inches long.

5. Use two pipe wrenches when making connection to

the gas valve to keep it from turning.

6. Install a manual shut-off valve in a convenient location

(within six feet of unit) between the meter and the
unit.

7. Tighten all joints securely.
8. The unit must be connected to the building piping by

one of the following methods:

Rigid metallic pipe and fittings

Semirigid metallic tubing and metallic fittings
(Aluminum alloy tubing must not be used in exterior
locations)

Listed gas appliance connectors used in accordance
with the terms of their listing that are completely in
the same room as the equipment

In the prior two methods above the connector or
tubing must be protected from physical and thermal
damage. Aluminum alloy tubing and connectors must
be coated to protect against external corrosion when
in contact with masonry, plaster or insulation or are
subject to repeated wettings by liquids (water - not
rain water, detergents or sewage).

PROVIDE CLEARANCE
FOR REMOVAL OF
ACCESS PANELS

MANUAL
SHUTOFF VALVE

DRIP LEG

DOOR

GROUND JOINT
UNION

PROPER PIPING PRACTICE

NOTE: The unit gas supply entrance is factory sealed with
plugs. Keep plugs in place until gas supply is ready to be
installed. Once ready, replace the plugs with the supplied
grommets and install gas supply line.

G

AS

P

IPING

C

HECKS

T

O

 

PREVENT

 

PROPERTY

 

DAMAGE

 

OR

 

PERSONAL

 

INJURY

 

DUE

 

TO

 

FIRE

THE

 

FOLLOWING

 

INSTRUCTIONS

 

MUST

 

BE

 

PERFORMED

 

REGARDING

 

GAS

 

CONNECTIONS

 

AND

 

PRESSURE

 

TESTING

:

 •   T

HE

 

UNIT

 

AND

 

ITS

 

GAS

 

CONNECTIONS

 

MUST

 

BE

 

LEAK

 

TESTED

 

BEFORE

 

PLACING

 

IN

 

OPERATION

. B

ECAUSE

 

OF

 

THE

 

DANGER

 

OF

 

EXPLOSION

 

OR

 

FIRE

NEVER

 

USE

 

A

 

MATCH

 

OR

 

OPEN

 

FLAME

 

TO

 

TEST

 

FOR

 

LEAKS

. N

EVER

 

EXCEED

 

SPECIFIED

 

PRESSURES

 

FOR

 

TESTING

H

IGHER

 

PRESSURE

 

MAY

 

DAMAGE

 

GAS

 

VALVE

 

AND

 

CAUSE

 

OVERFIRING

 

WHICH

 

MAY

 

RESULT

 

IN

 

PREMATURE

 

HEAT

 

EXCHANGE

 

FAILURE

.

•    T

HIS

 

UNIT

 

AND

 

ITS

 

SHUT

OFF

 

VALVE

 

MUST

 

BE

 

DISCONNECTED

 

FROM

 

THE

 

GAS

 

SUPPLY

 

DURING

 

ANY

 

PRESSURE

 

TESTING

 

OF

 

THAT

 

SYSTEM

 

AT

 

TEST

 

PRESSURES

 

IN

 

EXCESS

 

OF

 1/2 PSIG (3.48 

K

P

A

).

•    T

HIS

 

UNIT

 

MUST

 

BE

 

ISOLATED

 

FROM

 

THE

 

GAS

 

SUPPLY

 

SYSTEM

 

BY

 

CLOSING

 

ITS

 

MANUAL

 

SHUT

OFF

 

VALVE

 

DURING

 

ANY

 

PRESSURE

 

TESTING

 

OF

 

THE

 

GAS

 

SUPPLY

 

PIPING

 

SYSTEM

 

AT

 

TEST

 

PRESSURES

 

EQUAL

 

TO

 

OR

 

LESS

 

THAN

 1/2 PSIG (3.48 

K

P

A

).

CAUTION

T

O

 

AVOID

 

PROPERTY

 

DAMAGE

 

OR

 

PERSONAL

 

INJURY

BE

 

SURE

 

THERE

 

IS

 

 

IN

 

THE

 

VICINITY

 

DURING

 

AIR

 

BLEEDING

.

NO

 

OPEN

 

FLAME

WARNING

There will be air in the gas supply line after testing for leaks
on a new installation. Therefore, the air must be bled from
the line by loosening the ground joint union until pure gas is
expelled. Tighten union and wait for five minutes until all gas
has been dissipated in the air. Be certain there is no open
flame in the vicinity during air bleeding procedure. The unit is
placed in operation by closing the main electrical disconnect
switch for the unit.

Advertising